Last update 06/25/2002
|
Lake Clifton Park Measurements were begun on 30th June 2001, however, various problems prevented the full operation of all instruments during the July intensive. Fire at the site on 14th September 2001 brought the summer intensive to an end. Table below summarizes our Clifton Park measurements.
Trailer and instruments after the fire |